To use PP/DS (Advanced Planning) in S/4HANA, the material must be enabled for advanced planning in the Material Master.
1️⃣ Open Material Master
Transaction: MM02
2️⃣ Go to Advanced Planning View
3️⃣ Activate the field:
✔ Advanced Planning = Active
4️⃣ Maintain required planning parameters such as:
5️⃣ Ensure required master data exists:
6️⃣ Create PDS (Production Data Structure)
Transaction: /SAPAPO/CURTO_CREATE
7️⃣ Run planning and check results using:
Activating Advanced Planning in the material master enables the material for PP/DS detailed planning and scheduling in S/4HANA.