Course Curriculum
Special Business Scenarios
Available in
days
days
after you enroll
- Visual Instructions
- Equipment Status Fix
- Configurable Task List
- Counter Reading Overflow ERROR
- How to do Counter Reset for Measuring Point
- Create BOM for Construction Type
- AVLB + ESTO system status
- FIeld Key in General Task List
- Document Management - Equipment Manuals
- What is a Equipment PRT ?
- Material PRT
- What is a Miscellaneous PRT ?
- PRT Where-Used List and Mass Replace PRT Scenario is Equipment PRT)
- Service Master and General Task List Steps
- CA10 Short Text and Long Text Maintenance in PM
- Standard Text Key Where-Used List used in TLGroup and Counter and then which Maint.Plant and Maint.Items Part 1 Table Method
- Standard Text Key Where-Used List used in TLGroup and Counter and then which Maint.Plant and Maint.Items Part 2 Table Method & SAP Std Reports Method
- Refurbishment Subcontracting Step by Step
- Using Table EQUZ (Equipment Time Segment) for MTBF (Mean Time Between Repair) calculation
- Equipment latest Installation Functional Location Table
- Work Management with Compatible Units
- MEB Scenario STEPS MEB Links 1 Notification to Many MOs
- PM Pool assest management 1 (Request)
- PM Pool assest management 3 (IMG)
- SAP PM visual enterprise spare part list
- PM using SAP visual enterprise visual instructions
- SAP PM worker safety measure list basics
- PM configurable equipment and configurable task list in maintennance plan
- PM configurable material BOM for equipment
- PM configurable task list
- PM integrated material BOM (construction type) and equipment BOM
- Plant maintenance equipment status system conflicts
- Plant maintenance IFCU - Fleet recording and consumption
- PM PRT Equipment tracking of usage in PP
- PM maintenance notification with action box to email
- PM Maintenance event builder
- SAP PM - Internal refurbishment processing
- PM - Spare parts selection in maintenance order (visual enterprise view)
- Measurement Reading Transfer for Measuring Point from Superior Equipment to Measuring Points of Sub Equipments
- Calibration with Attribute Characteristics
- Time Strategy 1:2:2 hierarchy for 1M:6M:12M
- Maintenance Order Business Closing issue
- LEAN Service application in PM Maintenance Order
- Performance Based Preventive Maintenance based on Measuring Point (Engine Hours)
PM-CO Integration
Available in
days
days
after you enroll
- Activity Price Priority via Costing Variant
- Allocation Structure for MO Settlement Processing
- Operational Level Costing Material settle to Asset Operation labor costs settle to Cost Center
- Cost Error in Calculation No Price found When Release Maintenance Order
- Settlement Profile Configuration for Material Price Determination for Planned Cost and Actual Cost
- Value Categories in the Maintenance Order
- WBS as Settlement Rule to the Maintenance Order via WBS PS-PM integration
- Value Categories in the Maintenance Order
- Maintenance Order Cost Overview
- Allocation Structure for MO Settlement Processing
- Partial Settlement and Full Settlement
- Sub Order Settlement to Superior Order
- Activity type setup and configuration
- PM Maintenance order cost element determination
- PM Value categories
- PM operational level costing
- PM order settlement allocation structure
- Product cost planning scrap factor
- SAP IO,FA,EAM Basics (FI-FAA) - Create a fixed assest master record
- SAP IO,FA,EAM Basics (CO-IO) - Create an internal order (IO)
- SAP IO,FA,EAM Basics (CO-IO) - Process a commitment to an internal order
- SAP IO,FA,EAM Basics (EAM-IO) - settle an internal order
- SAP IO,FA,EAM Basics (CO-IO) -Process an internal order report
- SAP IO,FA,EAM Basics (FI-FAA) - Review fixed asset explorer
- SAP IO,FA,EAM Basics (CO-FAA) - Process an asset history sheet
- SAP IO,FA,EAM Basics - asset equipment link
- SAP IO,FA,EAM Basics - perform an overall completion confirmation
- SAP IO,FA,EAM Basics - view maintenance order actual cost
- Budget check for single maintenance order
- Preventive Maintenance Task List Costing (IA16)
- Preventive Maintenance Maintenance Plan Costing (IP31)
Master Data
Available in
days
days
after you enroll
- BOM Usage Config
- Equipment and Functional Location Creation Date
- General Task List Object Overview
- Operations Relationship
- Hierarchy Task List
- IBAU Materials as Assemblies in a Multi-Level BOM
- Measuring Point creation
- Easy setup for Multi-level Measuring Point Measuring Reading Transfer
- Measuring Point Measurement Reading Multi-Level Transfers
- Storage Location vs Location field in the PM Technical Objects
- Task List Cost Analysis
- Task List Engineering Change Management
- HANA for logistics - FIORI APP to create equipment
- PM - Create technical object (EQ) FIORI APP
- SAP PM - Create Maintenance task list for strategy plan (Time)
- Create general maintenance task list
- HANA for logistics - FIORI APP (Combine create FL AND EQ)
- PM equipment asset master synchronization
- PM Measuring point measuring document reading transfer
- HANA for logistics - FIORI APP to create counter (Measuring point)
- PM Permit (Technical permit)
- PM Technical object mass changes
- HANA for logistics - FIORI APP to create counter (Measuring point)
- Technical Object creation update Functional Location & Equipment
Business Process
Available in
days
days
after you enroll
- Component Assignment in EQ or FL Task List Operations
- EQ created first, Later need to link to Material-Serial but Serial-EQ Number not necessary synchronized
- How to Link to a Material-Serial Master
- IE4N BOMI (GI and Install) BOMR (Dismantle and GR) without SERIAL
- IE4N PMGI to GI and Install V.Type “NEW” PMGR to Dismantle and GR V.Type “RECON”
- IE4N Default Movement Type
- From Multiple Partners assigned to the EQ in Notification select One of the Partner
- Partner function unique in FL, EQ, Notification or Maintenance Order
- PM IE4N Goods issue and install equipment
- PM Equipment SWAP
- PM - using IE4N install sub - equipment of superior equipment
- PM event builder
- PM - using MEB to convert notification with hierarchy task list to multiple MO with multiphle maintenance
- SAP PM - LKD and Do not excute functions
- PM - Assign material BOM as Construction type to a new equipment
- Breakdown scenario via FIORI APP and backend notifications/order update
- Using manage order and notifications info center FIORI to TECO orders
- SAP IO,FA,EAM Basics - Technical completion of a maintenance order
- Single FIORI App processing End-to-End Process PM Scenario Malfunction Report
- Display , create , install EQ
- Technical Object create Material-Serial-Equipment and Install to Functional Equipment
- Confirm an order using "Manage malfunction report" FIORI APP
- Print to technician job list
Navigation & Overview
Available in
days
days
after you enroll
Configurations
Available in
days
days
after you enroll
- SAP Plant Maintenance Control Key
- Equipment Usage List (Time Segment) Configuration
- IE4N Preliminary Configuration
- Part 1 Related Configuration valid for ECC6.0 EhP7
- Part 2 Applications valid for ECC6.0 EhP7
- PM shift notes
- PM shift reports ECC6.0 EhP3
- PM alternative labeling system
- PM automatic task determination
- AV check at CRTD status of the Maintenance Order caused by Time point of Reservation Creation IMG setting
- IE4N Preliminary Configuration
- Preventive Maintenance Common Transaction Codes and Configuration menu paths
- Change priority type and priority for maintenance plan
- PM Reporting - 0PM_DS04 Data flow and data content
- PM - Usage period and usage list
- PM Reporting - using order group for cost reporting
- SAP - PM Confirmation report in FIORI
- PM S/4 Manage orders and notifications information center FIORI APP Features
- PM Master data information center FIORI APP
- Manage Malfunction Report FIORI App Spare Parts selection Error
Reports
Available in
days
days
after you enroll
- Equipment Usage List
- General Task List Operations FIeld keys TABLES
- MATERIAL Where-Used List
- BI Content (Repository of SAP PM related Info Cubes, Queries, Roles, and Process Chain)
- Costing Report Plan/Actual Comparisons
- ECC6 EhP7 Understanding Data Flow in the BW system 3.x2 and 7.0 BW Data Flow .a Multi-Provider Data Flow and a Data Store example
- Flexible Evaluation via the Info Structure “S555”
- Infor Structure S115 Key Figure and Maintenance Order Value Category
- Query (Web Template) Planned/Actual Costs Deviation
- Setup Statistical Data for PMIS updating (RELOAD data to the Info Structure)
- IW12 Document flow list (improved funtionality as at ECC6.0 EhP6)
- PM breakdown analysis MTTR MTBR
- PM BW1 Data flow
- PM Reporting - 0PM_C07 Infocube Data flow 3.x2
- PM BW2 Infocube data content
- PM BW3 BI EAM content
- PM BW4 BW Query
- SAP PM characteristics values reporting
- PM Reporting - IW13 Material where-used list
- PM Reporting - MCI8 Info structure investigation
- PM Reporting - RPT MCJB MTTR/MTBR for equipment
Serial Number Management
Available in
days
days
after you enroll
- Equipment with INST or AVLB System Status Link to Serial Master w/o STOCK
- Serial Number Management
- Batch creation of PI Doc EQUI vs ISED Table Consistency Check
- Material-Serial-Equipment with V.Type NEW and USED NEW with Value, RECON zero Value How to perform GI of V
- Material - Serial - Valuation Type ERROR Issues and REVERSA
- Serial Number Activation to ensure Batch field in Serial and Batch in MM to be consistent
- Serial Number Management Fine Tuning for Procedure MMSL (GR/GI)
- Special Serial no functions Manual Transactions
- Equipment special serial no. function Change Serial & Change Material
- Serial profile for plant maintenance material serial-equipment creation
- PM Serial/Equipment Synchronization
- PM Serial/Equipment Assest master synchronization
PM-PS Intergration
Available in
days
days
after you enroll
Maintenance Order
Available in
days
days
after you enroll
- Action Log
- Activation of Task List Copy from Notification to Order
- Adjust Basic Dates to be equal to the Scheduled Dates
- Assembly Processing for Spare Parts in the Warehouse
- Basic Dates and Scheduled Dates in Maintenance Order
- Non-Availability during Availability check to Block MO from Release and Non-Availability material to be created as Sub/Childe-MO
- BOM Header Dates and Maintenance Order
- How the BOM Item Dates affect its selection in the Maintenance Order
- SAP Plant Maintenance BS22
- Change Equipment Installation FL hierarchy and its Impact (focus on) 1. existing Notification and MO not TECO 2. inherited data after swtich FL 3. existing Maintenance Plans
- CO24 Missing Parts Database
- Commitment Management in Maintenance Order
- Cost Center data flow
- Maintenance Order Cost Overview
- MO Basic Date = Maintenance Plan’s Plan Date MP set with TIME Scheduling indicator Scheduled date in MO is based on Factory Calendar in the MO Work Center
- Release Strategy and PRSL Procedure Serial Mandatory
- Goods Issue to Maintenance Order after TECO
- Close Partial completed External Service Purchase Order when MO is in TECO status
- Plant Maintenance S4HANA 2021 (Inspection Type 8914) Inspection Checklist Part 1 SETUP
- using Inspection Checklist for Equipment Calibration Part 3
- Inspection Round Planning
- Inspection Round Planning and Confirmation
- Item Category “L” Stock Item Availability Check on Material Master without Accounting data view
- Item Category “C” in BOM
- There is a Reason why Standard SAP Settings Should not be Changed
- Material Where-Used List Reporting Planned and Unplanned Material Withdrawal from Maintenance Orders
- Maintenance Order Type Availability Check Missing Parts
- Availability check results overivew of all Missing Parts via Missing Parts Database
- Cost Error in Calculation No Price found When Release Maintenance Order
- NCMP (Do not Execute Status)
- No Movement Allowed Indicator even after MO Released
- using NWBC for Technician Confirmation
- Combine 2 Orders Reservations into Single PR for Opening Period 6 months with Safety Time 30 days
- OPJJ Check Control’s Reservation (un-check or checked) simulation on its affect to Maintenance Order Availability Check
- How to create external services for control key PM03 for Maintenance Order
- Material PRT Availability Check
- Maintenance Order Refurb/Subcon Processing via ADSUBCON
- Refurbishment process (External Subcontracting) using IW8W instead of IW31
- ‘RELR’ System Status Release Rejected System Status in Maintenance Order
- Requirement Dates and BOM Dates
- Rescheduling a Maintenance Order
- Reservation Creation at REL of MO
- Reservation Never and Always
- The question of when a Reservation is ACTIVE or REMOVED from the Planning System
- Select Spare Parts via “SP” file
- System Status “CSLD” Business Closing the Maintenance Order
- Set Reservations/PR creation to “1 Never” “2 At Release” “3 Immediately”
- Setup for Shop Paper and Printer assignment
- Spare Parts Backflushing
- Material Management Split Valuation for Spares Parts (without Serial numbers)
- MM-PM Order Reservation Stock Determination for Valuation Types
- PM Order with Sub-Order Creation
- Sub Order Settlement to Superior Order
- Criteria Selection Procedure for General Task Lists
- Task List Selection to Reference Object
- Task List Transfer
- Direct Entry Selection for Task Lists
- Further Selection Procedure for Tasks Lists
- Setup Storage Location for each Technician Group (VAN) PART 1
- TECO and unTECO, Re-TECO Account Assignment Effects
- Unplanned Goods Issue with reference to Maintenance Order
- Methods to De-activate a Called Maintenance Order in a Maintenance Plan to avoid it influencing the scheduling of the Next On-Hold or Maintenance Calls
- PM Alternative plant parts reservation
- PM - Assign person to work center and time sheet entry
- User status to block GI and confirmation after maintenance order is technically completed
- Maintenance order classic time sheet basics
- SAP PM COGI Post-Processing for failed goods issue in PM/CS orders
- PM Collective or Individual PR
- SAP PM - Confirmation report in FIORI
- PM - Costs views of maintenance orders in FIORI APPS
- HANA for logistics - FIORI to create maintenance order (part 1)
- S/4 HANA 1809 - Create order and plan operations using FIORI APP
- PM digital signature ECC6.0 EhP2
- PM - Scheduling and dispatch via resource scheduling for maintenance FIORI APP
- SAP PM ECC6.0 EhP7 - Enhanced document flow in the maintenance order
- PM Enhace order view
- PM Factory calender in work order
- PM Inspection Round ECC6.0 EhP4
- SAP PM - using manage order and notification info center FIORI to TECO orders
- PM - Material Withdrawal of spare parts and download job card to PDF
- PM - MRP-Subcon PR to PO
- Object information reporting current condition of equipment or functional location
- Plant maintenance - order groups
- PM refurbishment of spare parts - subcontracting (EhP2)
- PM refurbishment of spare parts - subcontracting (EhP4)
- PM - breakdown scenario via FIORI APP and backend notification/order update
- PM spare parts backflushing
- PM - Status control for shop papers ECC6.0 EhP2
- PM Support for time zones
- PM Transaction varient for IW31 with fixed order type and planning plant
- PM - Who deleted the reservation in the maintenance order
- SAP IO,FA,EAM Basics - create maintenance order
- Maintenance Order Field Selection
- Maintenance Order Component Availability Check (Issues and Resolution)
Availability Check
Available in
days
days
after you enroll
Notifications
Available in
days
days
after you enroll
- Plant Maintenance 2 Notification with Task List for 2 Equipments generate 1 Maintenance Order
- Multiple Partner in Equipment Master create Notification/Order prompt one partner
- PM Notification Setup Task Processor as USER
- HANA for logistics - FIORO APP to create, change maintenance notification and notification listings
- User setup for Role Based Menu for Notification creation
- HANA for logistics - FIORI APP to create, change maintenance notification and notification listing
- SAP IO,FA,EAM Basics - create a maintenance notification
Planning
Available in
days
days
after you enroll
- Maintenance Plan called Notification to record Measuring Doc for a series of MP for a FL’s EQ’s MP
- Counter Based Scheduling Logic Single Cycle Performance Maintenance Plan (one possible Calculation method) may not be Optimal (5 Simulations to Confirm the Calculations)
- Data flow from Maintenance Plan with Notification as call object from Maint.Plan to called Notification to the Maintenance Order
- Inspection Round Planning using Maintenance Plan
- IP10 Update Scheduling to IP03 and IP24
- Rescheduling of Maintenance Plan IP11U
- How to De-activate a Maintenance item
- Maintenance Plan for Spare Parts with Material - Serial without Equipment Number
- Maintenance Plan and Maintenance Item Related Configuration
- Maintenance Plan and Maintenance Item Structure
- Maintenance Plan with Hierarchy
- Preventive Maintenance Scenario Breakout Plans
- Preventive Maintenance scenario calling service entry sheet from a maintenance plan
- SES or Service Entry Sheet CALLS from Maintenance Plan
- How to defer or offset Maintenance Calls for a new Maintenance Plan with a Strategy Plan
- Single Cycle Counter Maintenance Plan
- Existing Counter with New Maintenance Plan (to adjust or not to adjust the Cycle Start)
- Strategy Plan Performance based (1) (all cycle DIFFERENT hierarchy)
- Strategy Plan Performance based (2) (all cycle SAME hierarchy)
- Counter Reading Transfer from Main Equipment to Sub-Equipment with Maintenance Plan for the Sub-Equipment
- Turbine Blade Refurb
- SAP EAM PM Call horizon in days (ECC6.0 Ehp7)
- PM Equipment rental using MM-PM integration
- SAP PM - Create Maintenance plan for the time based strategy (S/4)
- PM - Multi-counter plan 2-1 cycle squence
- PM service procurement maintenance plan
- FIORI APP to create and schdule single cycle maintenance for maintain item with FL AND EQ
- Create single cycle plan for equipments to 2 maintain item using FIORI APP
- Maintenance project without network
- Preparing and planning maintenance projects
- SAP IO,FA,EAM Basics - spare parts planning in maintenance order
- Thoughts, Tips, and Tricks about Plant Maintenance Capacity Planning and Scheduling
- Overload and Basic Leveling
- Capacity Planning and Scheduling in Maintenance Projects
- Case Scenario Maintenance Plan for related Equipments to be scheduled always at the same timing and combined into one Maintenance Order
- Maintenance planning overview
Work Clearance Management
Available in
days
days
after you enroll
PP- PM Integration
Available in
days
days
after you enroll
- PLM322 Capacity Planning and Scheduling in Maintenance Projects
- Item Category “S”
- Item Category “L”
- Item Category “T”
- Van Storage location assignment to Technician Group (Work center )
- Evaluating and leveling capacity
- Capacity planning with HR integration
- Approving and releasing revision, project and plant maintenance order
PM-QM Intergration
Available in
days
days
after you enroll
PM-PS Integration
Available in
days
days
after you enroll
- Cost planning and budgeting
- MEB PM-PS Baseline project version
- Capacity Planning and scheduling in Maint Project
- MEB identifying and attacking emergent work
- MEB- Rescheduling a project at the appropriate level
- MEB- Leveling capacity for additional work
- MEB- Completion
- MEB - Project analysis
- Capacity Planning and Scheduling in Maintenance Projects
- Using MEB to LINK PM to PS
Case study
Available in
days
days
after you enroll
Work Clearance Management
Available in
days
days
after you enroll
Click on the above arrow down button to expand Full Curriculum
Frequently Asked Questions
Can I get Refund, If I am not happy with course?
Write us with in 24 hours of course purchase and we will issue refund.
How Long will be access to Videos?
Course Access will be there for 1 Year