📌 What is Classic Planning?
Classic Planning = traditional MRP (Material Requirements Planning) run in PP.
- Infinite capacity → system plans material needs without checking resource limits.
- Focus: long-term, high-volume planning.
- Typical Tcodes: MD01N, MD02, MD04.
✔️ Example: Create planned orders for all demands — even if machines are overloaded.
📌 What is PP/DS Planning?
PP/DS (Production Planning & Detailed Scheduling) = advanced, constraint-based planning.
- Finite capacity → considers real resource limits and sequences.
- Uses advanced heuristics, pegging, and scheduling.
- Embedded in S/4HANA since 1610 — no separate SCM system.
- Tcodes: /SAPAPO/CDPS0 (Planning Board), /SAPAPO/RRP3 (Product View).
✔️ Example: Schedule orders realistically, avoid bottlenecks, optimize machine use.
📊 Key Differences
Classic PlanningPP/DS PlanningInfinite capacityFinite, constraint-basedLead time schedulingDetailed sequencingBasic peggingDynamic peggingSimple heuristicsAdvanced heuristics, optimizerGood for long-term planBest for short-term, critical products
✅ When to Use Each?
- Classic MRP → fast, high-level planning for all products.
- PP/DS → for bottleneck resources, tight schedules, priority products.
Many companies run hybrid planning: MRP for rough-cut, PP/DS for detailed feasible plans.
📂 Useful Tcodes
- Classic MRP: MD01N, MD04
- PP/DS: /SAPAPO/CDPS0, /SAPAPO/RRP3
✅ Conclusion
Classic Planning is quick and simple — good for bulk planning.
PP/DS Planning adds realism — ensuring production plans fit actual resource availability.