Classic Planning and PPDS Planning

📌 What is Classic Planning?

Classic Planning = traditional MRP (Material Requirements Planning) run in PP.

  • Infinite capacity → system plans material needs without checking resource limits.
  • Focus: long-term, high-volume planning.
  • Typical Tcodes: MD01N, MD02, MD04.

✔️ Example: Create planned orders for all demands — even if machines are overloaded.


📌 What is PP/DS Planning?

PP/DS (Production Planning & Detailed Scheduling) = advanced, constraint-based planning.

  • Finite capacity → considers real resource limits and sequences.
  • Uses advanced heuristics, pegging, and scheduling.
  • Embedded in S/4HANA since 1610 — no separate SCM system.
  • Tcodes: /SAPAPO/CDPS0 (Planning Board), /SAPAPO/RRP3 (Product View).

✔️ Example: Schedule orders realistically, avoid bottlenecks, optimize machine use.


📊 Key Differences

Classic PlanningPP/DS PlanningInfinite capacityFinite, constraint-basedLead time schedulingDetailed sequencingBasic peggingDynamic peggingSimple heuristicsAdvanced heuristics, optimizerGood for long-term planBest for short-term, critical products



When to Use Each?

  • Classic MRP → fast, high-level planning for all products.
  • PP/DS → for bottleneck resources, tight schedules, priority products.

Many companies run hybrid planning: MRP for rough-cut, PP/DS for detailed feasible plans.


📂 Useful Tcodes

  • Classic MRP: MD01N, MD04
  • PP/DS: /SAPAPO/CDPS0, /SAPAPO/RRP3

Conclusion

Classic Planning is quick and simple — good for bulk planning.
PP/DS Planning adds realism — ensuring production plans fit actual resource availability.
Together, they help companies balance speed, accuracy, and feasibility.