Autoplay
Autocomplete
Previous Lecture
Complete and Continue
SAP PPDS - Content Library
PPDS PDF
PPDS Unit 1
PPDS Unit 2 Master Data
PPDS Unit 3 Integration
PPDS Unit 4 Requirement Strategy
PPDS Unit 5 Production Planning
PPDS Unit 6 Order Processing
PPDS Unit 7 Interactive Planning
PPDS Unit 8 Optimization
PPDS Unit 9 Characteristic Planning
Session Notes SAP PPDS
PP-DS with SAP S4 HANA
Old MRP Planning vs ePPDS Planning
Production Planning Master Data
PPDS Heuristic in SAP
Detailed Scheduling Planning Board in SAP S4 PPDS
Monitoring & Reporting tools in ePPDS
Production Planning Optimizer (PPO)
Subcontracting – source location
PPDS
Use of Core Interface in S/4 and the Transfer of PDS and Transaction Data to Advanced Planning in S/4
SAP CIF (Core Interface) – Complete PPDS Cheat Sheet
Planning Strategy
Strategy “40” and Sub-Strategy “20” with Advanced Planning Activation
Planning Group in Advanced Planning
Classic Planning and PPDS Planning
Strategy 10 Make-to-Stock Production (initial test based on standard ECC Strategy to APO Strategy Mapping)
Strategy 11 Make-to-Stock “Gross Planning” (initial test based on standard ECC Strategy to APO Strategy Mapping)
Strategy 40 Planning w/Final Assembly in S/4 for Advanced Planning
S/4 Strategy “40” ans APO Strategy “20” with “Period Specific Consumption”
Strategy 50 in S/4 1909 Comparing the resuls without Advanced Planning and with Advanced Planning
Strategy 70 Planning at Sub-Assembly in S/4 for Advanced Planning
ERP Strategy “74”, APO Strategy “Not sure” Make-to-Order Sub-Assembly Planning
ERP Strategy “82 with APO Strategy “-” Assembly Strategy with Production Orders
MRP planning with strategty 70 MRP live
MRP 3 view Strategy and APO Strategy
ERP Strategy “50”, APO Strategy “30” Make-to-Order Planning without Assembly using MRP Live
Activating PPDS for Advanced Planning for Strategy Group “40” and APO Strategy “20”
Material Master
MRP Controller use in Classic MRP and Advanced Planning
Role of the Classic Time Fence in S/4HANA Classic S/R List vs PPDS Product View
Workcenter Master Data
Person Responsible and Capacity Responsible in Work Center
CONFIGURATION
Product Heuristics in MD04 and Product View
End to End Business Process
Executing planning run using MRP or PPDS heuristics (initial investigation)
Apply net demand, lot size rules, and a basic view of fixed pegging & dynamic pennging in S/4 HANA PPDS
PP execution basic steps using APO and FIORI APP
Planning
APO demand planning excel 2-way
APO DP1 internal business warehouse
APO DP2 Creating a master planning object structure
APO DP3 key characteristics combination
APO DP4 Planning area
APO DP5 calcluate proportional factors
APO PPDS SetupTime optimization part 1
APO PPDS SetupTime optimization part 2
MRP Controller & Production Planner Product Group and Planning Group MD01, MD02, MD01N, /SAPAPO/CDPSB0
Scheduling Margin Key, Planned Order, Create PR, Create Plan Order in Opening Period and PPDS Horizon in Classic MD02 vs MRP Live with or without Advanced Planning Activation
MASTER DATA
Use of Core Interface in S/4 and the Transfer of PDS and Transaction Data to Advanced Planning in S/4
SAP APO Tank Resource Simulation 1 in S4 1709 (but require further confirmation and Simulations)
APO Work center introduction
Set advanced planning for material master
Transfer BOM as PDS to PP/DS
Activate advanced planning for material master to product master (APO) and transaction data from classical to advances planning
APO work center introduction
Set advanced planning for material master for APO PPDS in S/4
Create new Plant and replicate as APO Location Master with Material (Product) Activation for Advanced Planning for the new Plant
DS Planning Board
1809 the use of the detailed scheduling planning board in S/4 HANA
MRP planning
Classic MRP, MRP Live, and PPDS before and after Advanced Activations
SAP S/4 HANA PPDS RUN
Safety Stock inclusion and exclusion from Receipt Days Supply (RDS) Calculation
Special Business Process
How to activate consumption based planning material for advanced planning
DS Planning Board
Use of APO PPDS DS Planning board in S/4 hana 1809
Heuristics
Overview of 1809 FIORI APP for detailed scheduling with FINITE scheduling heuristics "Stable forward scheduling" in S/4 HANA PPDS
Teach online with
Subcontracting – source location
Lecture content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock